villagd.blogg.se

Raymond 112 operator manual
Raymond 112 operator manual













  1. Raymond 112 operator manual how to#
  2. Raymond 112 operator manual manual#

The court concluded, "Perhaps a design defect case can be mounted without calculations to support an expert's theories, but the district court did not err in concluding that some calculations were necessary to demonstrate the feasibility of ideas." Id. In Watkins, the circuit court faulted the expert for failing to make any diagrams or calculations to demonstrate that the alternative design "would have prevented the accident without sacrificing utility." 121 F.3d at 992.

Raymond 112 operator manual how to#

2, 2000), the court excluded part of the expert's testimony because he "offered scant testimony concerning an engineering methodology on the issue of how to design, fabricate or install a guard that would make a machine safe but not interfere with the operation of the machine." Id. This may involve computer analyses and calculations and likely involves testing of the proposed modification. Feasibility of Suggested Modification - In alternative design cases, one of most important aspects of an expert's testimony is whether the proposed alternative design or modification is feasible and/or compatible with the underlying design. As the Court noted in Daubert, the inquiry is a flexible one. (1) whether a method consists of a testable hypothesis (2) whether the method has been subject to peer review (3) the known or potential rate of error (4) the existence and maintenance of standards controlling the technique's operation (5) whether the method is generally accepted (6) the relationship of the technique to methods which have been established to be reliable (7) the qualifications of the expert witness testifying based on the methodology and (8) the non-judicial uses to which the method has been put.

  • Thus, to recapitulate, among the indicia of reliability that courts may consider in evaluating expert testimony under Rule 702 are the following: 1) federal design and performance standards 2) standards established by independent standards organizations 3) relevant literature 4) evidence of industry practice 5) product design and accident history 6) illustrative charts and diagrams 7) data from scientific testing 8) the feasibility of suggested modification and 9) the risk-utility of suggested modification.
  • Pages affected by technical changes are identified with “Page Revised: Mo/Day/Yr” in the footer. Technical changes – These changes are identified by a vertical line (change bar) in the left margin next to the change. Pages are revised due to technical and non-technical changes described as follows: Whenever a page is revised, this section is updated and included in the revision package. Page Revision Record This section is a record of all revised pages in this manual. A-3 Component Specific Torque/Information Chart. A-2 Thread Adhesives, Sealants, and Lubricants. 7-54 Fork Carriage with Sideshift - TF/TT Masts. 7-52 Guide Shoe (Puck) Adjustment - TF/TT Mast. 4-2 Initial 90 Day/250 Pump Hour Maintenance. All other brand and product names are trademarks or registered trademarks of their respective companies. The following terms are trademarks of The Raymond Corporation: Safety On The Move, ACR System, and Raymond. To locate your local authorized Raymond Dealer, go to ©2010 The Raymond Corporation. If you need assistance with your lift truck, or to order additional copies of this manual, contact your local authorized Raymond Dealer. For revision information, see “Page Revision Record” on page iii.

    raymond 112 operator manual

    Changes occur periodically to the information in this publication. This publication, 1113065, applies to Raymond Model 4450 Sit-Down Counterbalanced Lift Trucks.

    Raymond 112 operator manual manual#

    Maintenance Manual Model 4450 Sit-Down Counterbalanced Lift Truck With The ACR System ™















    Raymond 112 operator manual